Once a tree is cut and sawn by a sawmill to say a thickness of 3 1/2 boards, with the bark still on the edges, how long should you air dry those boards before working them up into laminations. I have some that was cut last March, and we took a 45 inch piece of it yesterday and planed it down to size and thickness, but it feels like it is wet. Just wondering what you guys do when sawing lumber for laminations, the process of drying it before working it up?