I don't bother with a moisture meter. I just put the wood very close to the ceiling in the garage when its about 12-15%. This is after the wood is sitting outside in a unheated shed for about 8 months.
I usually cut the sealed ends by this time, and I can gauge the wood dryness very close by this method. After a few weeks you should notice some tiny cracks in the ends, that basically tells me its time to work it.
This method has never failed me.