yup--its a 1/4" plate of hot roll-with the rub collar welded from the bottom and ground flush-it sits on the existing end table-with two machine screws keeping it in place-the dust collection is removed for clarity--its a chute that bolts on with those two bolts behind the wheel and gets piped over head to the other side of the room---if you build more than a few bows its the only way to go