Sorry this is all taking so long guys. PBS Odd year last week set me back, along with trying to get a bunch of bows done this month. I finally got back on the Twisters though and thought I would share a few pics of the process of adding the handle scales.
This is the G10(?) stuff that Rob provided.
I cut them to rough size, add some Smooth On epoxy, and pin them to the blade using brass pins. They look pretty rough at this point. I cover them with Saran Wrap before clamping so I don't have to grind off my C clamps!
A little work with the belt, spindle, and drum sanders and they start to take shape a bit.
Then on to the hand work with files and sandpaper.
That's where I ended last night. My plan is to finish these three up before leaving for Denton Hill on Sunday.